placeholder

Unplugged.

Learn how the largest U.S. battery-electric bus fleet overcomes range limitations and lowers costs with high-power wireless charging.

The Antelope Valley Transit Authority achieved a U.S. record 5 million ZE miles by deploying WAVE’s hands-free charging to extend the range of their electric fleet far beyond standard operating range. How did they do it?

Download this comprehensive case study to discover 
how AVTA:

• Saved millions over legacy charging technologies
• Addressed safety concerns by reducing high-voltage cables and overhead equipment 

• Eliminated overhead clutter and disconnecting cables from their in-route charging infrastructure 

Simply complete the form to download your copy today. 
Questions? Contact the WAVE team at gowireless@WAVE.com.

placeholder

Contact

4752 West California Avenue
Suite B-400
Salt Lake City, UT 84104

(801) 935-8650

GOWIRELESS@WAVEIPT.COM


©2021 WAVE INC. ALL RIGHTS RESERVED.